Catering HACCP Plan: Starter CCP Table
Starter HACCP control points for a catering. Use them as a draft and validate with your food safety team and local regulator before audit.
| Step | Hazard | Critical limit | Monitoring | Corrective action |
|---|---|---|---|---|
| Cooling after cooking | Spore germination | Cool quickly, e.g. 60 C to 21 C within 2 h then to 5 C | Time/temp log | Discard if limit exceeded |
| Transport | Growth in transit | Hot at or above 63 C; cold at or below 5 C | Probe at loading and arrival | Reheat/discard |
| Allergen labelling | Undeclared allergens | Labels match recipe version | Pre-dispatch check | Relabel or withhold |
General guidance only; limits vary by country and process.
Open →
FAQ
What are typical critical control points for a catering?
Cooling after cooking (Cool quickly, e.g. 60 C to 21 C within 2 h then to 5 C); Transport (Hot at or above 63 C; cold at or below 5 C); Allergen labelling (Labels match recipe version).
Can I use this as my HACCP plan?
Treat it as a starting draft. A compliant plan needs your own hazard analysis, validated limits, monitoring records and verification.
Do I need ISO 22000 or ISO 9001 as well?
HACCP is the food-safety method; ISO 22000 and ISO 9001 are management-system standards that can wrap around it. Requirements depend on customers and regulators.
Related
Bakery HACCP planRestaurant HACCP planCoffee roastery HACCP planDairy HACCP planMeat processing HACCP planSeafood HACCP planFood truck HACCP planBottled water HACCP planFresh produce packing HACCP plan
Runs in your browser. Nothing you type is uploaded. Updated 2026-11-22.