Home

Catering HACCP Plan: Starter CCP Table

Starter HACCP control points for a catering. Use them as a draft and validate with your food safety team and local regulator before audit.

StepHazardCritical limitMonitoringCorrective action
Cooling after cookingSpore germinationCool quickly, e.g. 60 C to 21 C within 2 h then to 5 CTime/temp logDiscard if limit exceeded
TransportGrowth in transitHot at or above 63 C; cold at or below 5 CProbe at loading and arrivalReheat/discard
Allergen labellingUndeclared allergensLabels match recipe versionPre-dispatch checkRelabel or withhold

General guidance only; limits vary by country and process.

Build your full ISO 9001 / 27001 / HACCP documentation with the free interactive builder.
Open →

FAQ

What are typical critical control points for a catering?

Cooling after cooking (Cool quickly, e.g. 60 C to 21 C within 2 h then to 5 C); Transport (Hot at or above 63 C; cold at or below 5 C); Allergen labelling (Labels match recipe version).

Can I use this as my HACCP plan?

Treat it as a starting draft. A compliant plan needs your own hazard analysis, validated limits, monitoring records and verification.

Do I need ISO 22000 or ISO 9001 as well?

HACCP is the food-safety method; ISO 22000 and ISO 9001 are management-system standards that can wrap around it. Requirements depend on customers and regulators.

Related

Bakery HACCP planRestaurant HACCP planCoffee roastery HACCP planDairy HACCP planMeat processing HACCP planSeafood HACCP planFood truck HACCP planBottled water HACCP planFresh produce packing HACCP plan

Runs in your browser. Nothing you type is uploaded. Updated 2026-11-22.